Frequently Asked Questions

How to replace?

  • Step 1: Remove the existing shelf and support posts.
  • Step 2: Align the new 63PS post in the desired position.
  • Step 3: Secure the post with the included leveling bolt and cap.

Estimate time?

Typically, replacement takes about 15-30 minutes.

Light
Dark