Frequently Asked Questions

How to replace?

  • Turn off the power supply to the equipment.
  • Remove the access panel to reach the liquid level control.
  • Disconnect the old liquid level control and install the new one.

Estimate time?

Typically 30 minutes.

Light
Dark