Frequently Asked Questions

How to replace?

  • Step 1: Disconnect power to the conveyor system.
  • Step 2: Remove the old link by unscrewing or detaching it from the conveyor.
  • Step 3: Install the new 2B-200601 link in its place and secure it properly.

Estimate time?

Replacing the link typically takes around 15-30 minutes.

What tools do I need for replacement?

A screwdriver or wrench may be required, depending on the installation type.

Light
Dark