Frequently Asked Questions

How to replace?

  • Step 1: Unplug the brewing system for safety.
  • Step 2: Locate the existing control board and disconnect it.
  • Step 3: Install the new level control board and reconnect.

Estimate time?

Approximately 15-30 minutes.

What tools are needed?

A screwdriver and multimeter are recommended.

Light
Dark