Frequently Asked Questions

How to replace?

  • Step 1: Disconnect power to the machine.
  • Step 2: Remove the old liquid level control.
  • Step 3: Install the new liquid level control and reconnect power.

Estimate time?

Approximately 10 minutes.

Light
Dark